EEC Fabrication at Spitzer’s Houston Waterfront Facility
Spitzer provides EEC fabrication at its Houston Waterfront Facility, including fully assembled structures, barge shipping, and Factory Acceptance Testing support.

News barge shipping, EEC, Electrical Equipment Center, Electrical Equipment Center Fabrication, fabrication, factory acceptance testing, fully assembled structures, houston waterfront facility, industrial electrical infrastructure, modular electrical enclosure, modular electrical systems, spitzer, volta, waterfront
Spitzer provides EEC fabrication at its Houston Waterfront Facility, including fully assembled structures, barge shipping, and Factory Acceptance Testing support.
News fabrication, factory acceptance testing, fully assembled structures, industrial manufacturing, quality, safety, spitzer
Spitzer earns recognition from ConocoPhillips as a 2025 Supplier Award winner, highlighting performance, collaboration, and commitment to doing business better.
News energy infrastructure fabrication, fabrication, jumpers, manifolds, midstream, offshore, PLEM, pythonx, spitzer, subsea, topside process modules, waterfront
Spitzer Industries expands structural steel fabrication capacity in Houston with robotic PythonX cutting technology and waterfront facility growth.
News acquire, acquisition, business wire, industrial, infrastructure, m&a, news, pr, press release, race rock, spitzer
Race Rock is pleased to announce the acquisition of Spitzer Industries, a long-standing provider of engineered equipment and modular solutions for energy and industrial markets.

